Rover P6 BW65 gear shifter set up

Finished the bracket on the box, made the inspection hole and cover and modified the bracket on the ZF box into a clevis

CIMG4055.jpg


All parts were shotblasted primed and given a top coat

CIMG4057.jpg


Then two shifter locking plates were welded up and a piece was cut out from a spare shifter

CIMG4061.jpg


These welded up plated were fitted to the shifter and connected to the shifter cable

CIMG4065.jpg


Then i ran threw the gears and marked the positions where the new grooves needed to be made which gave the following result

CIMG4067.jpg


The P,R,N and D position are now very precise and solid. The 1,2 and 3 position can ll be reached but are less precise due to the tight fit. Also reduces the diameter from the locking pin in the shifter handle from 3,5 to 3mm,

Peter
 
Back
Top