Finished the bracket on the box, made the inspection hole and cover and modified the bracket on the ZF box into a clevis
All parts were shotblasted primed and given a top coat
Then two shifter locking plates were welded up and a piece was cut out from a spare shifter
These welded up plated were fitted to the shifter and connected to the shifter cable
Then i ran threw the gears and marked the positions where the new grooves needed to be made which gave the following result
The P,R,N and D position are now very precise and solid. The 1,2 and 3 position can ll be reached but are less precise due to the tight fit. Also reduces the diameter from the locking pin in the shifter handle from 3,5 to 3mm,
Peter
All parts were shotblasted primed and given a top coat
Then two shifter locking plates were welded up and a piece was cut out from a spare shifter
These welded up plated were fitted to the shifter and connected to the shifter cable
Then i ran threw the gears and marked the positions where the new grooves needed to be made which gave the following result
The P,R,N and D position are now very precise and solid. The 1,2 and 3 position can ll be reached but are less precise due to the tight fit. Also reduces the diameter from the locking pin in the shifter handle from 3,5 to 3mm,
Peter